PDU Load Balancing Review
PDU Load Balancing Review
Inspection template for verifying power distribution unit loads remain within rated capacity and are balanced across redundant feeds in a data center environment.
Inspection Scope and PDU Identification
-
PDU asset ID and location recorded
Record the PDU identifier, room/row/rack location, and feed designation.
-
Inspection date and inspector recorded
Capture the date and time of the inspection.
-
PDU nameplate rating verified
Confirm the PDU nameplate rating is legible and available for comparison against measured load.
-
Single-line or circuit reference available
Confirm the applicable circuit or single-line reference is available for the PDU and its redundant feeds.
Load and Capacity Verification
-
Measured total load is within rated capacity
Record the measured total load on this PDU and verify it does not exceed the rated capacity.
-
Peak load margin remains available
Record the estimated remaining capacity margin after normal operating load and expected growth.
-
Phase loading is balanced across phases
Assess whether phase loading is reasonably balanced and does not show a significant imbalance that could indicate a deficiency.
-
No overloaded branch circuits or receptacles observed
Confirm no branch circuit, receptacle, or outlet on the PDU shows signs of overload, overheating, or nuisance tripping.
Redundant Feed Balance
-
A feed and B feed loads are balanced
Record the load balance between redundant feeds and verify the difference remains within the site's acceptable limit.
-
Redundant feed is present and energized
Confirm both redundant feeds are present, energized, and supplying the intended load path.
-
Transfer or failover condition reviewed
Verify the PDU load distribution supports redundancy during a feed loss or transfer condition without exceeding capacity.
Physical Condition and Electrical Safety
-
No visible damage, overheating, or arcing evidence
Inspect for discoloration, melted insulation, scorch marks, unusual odor, or other signs of overheating or arcing.
-
Cables and connectors are secure and strain-relieved
Confirm power cords, plugs, and connectors are fully seated, secured, and not under tension.
-
Access to PDU is unobstructed
Verify the PDU is accessible for inspection and emergency service without obstruction.
-
Lockout-tagout status verified for any maintenance work
If maintenance is in progress or planned, confirm lockout-tagout controls are applied per OSHA 1910.147 before exposure to energized parts.
Corrective Actions and Sign-off
-
Deficiencies documented with corrective action
Document any deficiency, non-conformance, or critical item failure and assign the corrective action, owner, and due date.
-
Escalation to facilities or electrical lead completed
Confirm any critical item failure or out-of-limit condition has been escalated to the appropriate facilities or electrical lead.
-
Inspector signature captured
Inspector signs to confirm the review is complete and accurate.