Loading...

Nameplate Verification Against Drawings

Nameplate Verification Against Drawings

Inspection template to confirm equipment nameplate ratings, serial numbers, model/configuration, and safety markings match the order, approved drawings, and test reports before shipment. Helps prevent mismatched units from reaching the field.

Inspection Details

  • Inspection date and inspector recorded
  • Unit identifier recorded
    Record the internal job number, work order, or asset ID for the unit being inspected.
  • Approved drawing and order package available at point of inspection
    Verify the current approved drawing revision, order specification, and test report package are available for comparison.

Document Match

  • Nameplate part number matches approved drawing
    Verify the nameplate part number or label code matches the approved drawing and bill of materials.
  • Model designation matches order and drawing
    Confirm the model, series, or configuration designation on the nameplate matches the order and drawing revision.
  • Serial number matches traveler and test report
    Confirm the serial number on the unit nameplate matches the manufacturing traveler, test report, and shipment record.
  • Configuration code or suffix matches approved build
    Verify any suffix, option code, or configuration identifier on the nameplate matches the approved build and customer order.

Nameplate Content and Ratings

  • Supplier or manufacturer name present and legible
    Confirm the manufacturer or supplier name is present, correct, and readable on the nameplate.
  • Electrical or mechanical ratings match approved specification
    Verify voltage, current, frequency, horsepower, pressure, capacity, or other applicable ratings match the approved specification and drawing.
  • Safety markings and certification marks present as required
    Confirm required safety markings, warning labels, and certification marks are present and match the approved label set.
  • Nameplate text is legible and permanently affixed
    Check that the nameplate is securely attached, not peeling, and readable without damage or distortion.

Physical Placement and Configuration

  • Nameplate location matches approved drawing
    Verify the nameplate is installed in the correct location and orientation shown on the approved drawing.
  • All required labels and sub-nameplates installed
    Confirm auxiliary labels, warning plates, and sub-nameplates required by the drawing are installed and correct.
  • No unauthorized substitutions or field modifications observed
    Check for mismatched label stock, handwritten changes, rework marks, or any unauthorized modification to the nameplate or identification system.

Disposition and Release

  • All discrepancies documented as non-conformance if found
    If any mismatch or deficiency is found, confirm it has been recorded as a non-conformance and the unit placed on hold.
  • Unit approved for shipment
    Release the unit only when the nameplate, ratings, serial number, and configuration all match the approved order package.
  • Inspector signature
Ask AI Template Studio

Let's customize Nameplate Verification Against Drawings.

Tell me how you'd like to adapt it. For example:

  • Add a question about delivery time.
  • Make it shorter — 5 questions max.
  • Tailor it for the hospitality industry.
  • Translate the labels into Spanish.
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?