Makeup Air Unit Seasonal Service Report
Makeup Air Unit Seasonal Service Report
Seasonal inspection template for makeup air units (MAUs) to document burner condition, gas pressure, supply airflow, exhaust balance, freeze stat operation, and related maintenance findings.
Inspection Setup and Unit Identification
-
Unit identification verified
Record the MAU asset tag, location, and unit nameplate information.
-
Service area accessible and free of obstructions
Access panels, roof access, and work area are clear for safe inspection.
-
Lockout-tagout applied before internal inspection
Verify equipment is isolated and secured per site LOTO procedure before opening panels or touching internal components.
-
Inspector name and service date recorded
Document who performed the service and when it was completed.
-
Required PPE used
Confirm appropriate PPE was worn for the task, such as gloves, eye protection, and fall protection if applicable.
Burner and Combustion Components
-
Burner assembly clean and free of visible damage
Check burners for corrosion, soot buildup, distortion, loose mounting, or signs of flame impingement.
-
Ignition components secure and serviceable
Verify igniter, pilot components, and flame-sensing parts are properly mounted and not visibly damaged.
-
Combustion air openings unobstructed
Confirm combustion air intake paths are clear and not blocked by debris, ice, or nesting material.
-
Flue or exhaust path visually clear
Inspect venting path for visible blockage, deterioration, or disconnected sections.
-
Burner compartment cleaned as needed
Document whether dust, debris, or residue was removed from the burner compartment during service.
Gas Pressure and Fuel Train
-
Incoming gas pressure measured
Record the inlet gas pressure at the unit during service.
-
Manifold gas pressure measured
Record the manifold pressure and compare it to the unit nameplate or manufacturer requirements.
-
Gas train fittings free of leaks
Check accessible gas train connections, valves, and fittings for evidence of leakage using approved leak detection methods.
-
Gas shutoff valve accessible and labeled
Verify the manual shutoff valve is accessible, identified, and operable.
Airflow and Exhaust Balance
-
Supply airflow measured
Record the delivered supply airflow for the MAU.
-
Supply airflow within target range
Confirm measured supply airflow is within the project or TAB target range.
-
Exhaust balance verified
Confirm exhaust airflow is balanced relative to supply requirements and building operating conditions.
-
Belts and pulleys in good condition
Inspect belts for wear, tension, alignment, and visible cracking; verify pulleys are secure.
-
Filters clean or replaced
Document filter condition and whether filters were cleaned or replaced during service.
Controls and Freeze Stat Function Test
-
Freeze stat function test completed
Simulate or verify freeze stat operation per site procedure and document the response.
-
Freeze stat trips and resets properly
Confirm the freeze stat initiates the intended safety response and resets correctly after test.
-
Control panel free of active alarms or faults
Check the unit controller for active alarms, fault codes, or abnormal indications.
-
Safety controls operational
Verify applicable safeties such as high limit, airflow proving, and interlocks operate as intended.
Ask AI
Template Studio