Loom Setup and Warp Tension Verification Log
Loom Setup and Warp Tension Verification Log
Inspection log for loom start-up to verify warp tension, reed and heddle setup, and pick density before production weaving begins.
Inspection Details
-
Loom identification recorded
Record the loom ID, machine number, or asset tag used for this start-up verification.
-
Date and time of start-up verification
Capture when the loom setup verification was completed.
-
Operator or inspector name recorded
Enter the name or employee ID of the person completing the verification.
Warp Tension Verification
-
Warp tension is uniform across the width of the loom
Verify that warp tension is even from selvedge to selvedge and suitable for the intended fabric construction.
-
Warp tension measurement recorded
Record the measured warp tension at start-up.
-
Warp tension within target specification
Confirm the measured tension falls within the job or SOP target range for the fabric being woven.
Reed and Heddle Setup
-
Reed installed correctly and secured
Verify the reed is the correct specification for the job and is seated and secured properly in the beater/frame.
-
Heddles threaded according to draft
Confirm heddle threading matches the approved weave draft and no mis-threaded ends are visible.
-
Warp ends are evenly distributed through reed dents
Check that ends per dent match the draft and there are no crowding, skips, or unintended doubles.
Pick Density and Fabric Formation
-
Initial pick density measured
Record the pick density at loom start-up or after the first sample section.
-
Pick density within target specification
Confirm the measured pick density matches the approved construction requirement for the fabric style.
-
Fabric formation is consistent at start-up
Verify the first woven section shows stable shed formation, even beat-up, and no obvious distortion or barre.
Loom Readiness and Release
-
No visible defects or obstructions affecting operation
Confirm there are no loose parts, obstructions, or setup issues that could affect safe and consistent weaving.
-
Corrective actions documented for any deficiencies
Describe any non-conformance found during setup verification and the action taken to correct it.
-
Loom released for production
Final authorization that the loom is ready to run after all required checks are complete.
Ask AI
Template Studio