Light Gauge Steel Framing Inspection
Light Gauge Steel Framing Inspection
Inspection template for verifying light-gauge steel cold-formed framing installation, including screw spacing, track gauge, and bridging compliance.
Project and Inspection Details
- Project name and location recorded
- Inspection date and time recorded
- Inspector name and company recorded
- Area, floor, gridline, or room identified
- Approved drawings, shop drawings, and submittals available on site
- Applicable inspection criteria confirmed
Materials and Member Verification
- Studs, tracks, and accessories match approved member sizes and gauges
-
Track gauge measured within approved specification
Enter the installed track gauge or thickness as specified on the approved documents.
- Members are free of visible damage, excessive corrosion, or deformation
- Cut edges, notches, and punch-outs are acceptable and do not compromise member integrity
- Fasteners and connectors match approved type and corrosion protection
Layout, Alignment, and Plumb
- Layout matches approved dimensions and opening locations
-
Stud spacing measured and compliant with approved design
Record the on-center spacing used for the inspected framing run.
- Walls, partitions, or framing lines are plumb, level, and straight within tolerance
- Openings, headers, and jambs are framed per approved details
Fasteners and Screw Spacing
- Fastener type and length match approved specification
-
Screw spacing at track-to-stud connections complies with approved detail
Enter the measured screw spacing for the connection being inspected.
- Required number of fasteners at each connection point is installed
- Fasteners are properly seated without stripping, overdriving, or missed members
Bridging, Bracing, and Stability
- Bridging is installed at required locations and intervals
- Bridging members are properly attached and continuous where required
- Temporary bracing remains in place until framing is stable
- No visible instability, excessive deflection, or unsecured framing members observed
Final Condition and Sign-Off
- Deficiencies documented with location and corrective action
- Follow-up inspection required
- Inspection result
- Inspector signature