ISO 27001 Annex A Evidence Collection Log
ISO 27001 Annex A Evidence Collection Log
Inspection template for tracking Annex A control evidence for an ISMS, including evidence type, review dates, reviewer sign-off, gaps, and remediation status.
Scope and Control Identification
-
Annex A control identifier recorded
Record the applicable ISO 27001 Annex A control reference and control title.
-
Control owner identified
Name the accountable control owner or process owner responsible for the evidence.
-
Evidence record linked to ISMS scope
Confirm the evidence applies to the documented ISMS scope, asset, process, or location.
-
Evidence period covered
Enter the date range covered by the evidence package.
-
Reference document or SOP available
Provide the linked policy, procedure, standard, or SOP used to generate the evidence.
Evidence Completeness and Quality
-
Evidence artifact attached
Attach the record, screenshot, report, export, or log supporting the control.
-
Evidence is legible and complete
Confirm the artifact is readable, unredacted where appropriate, and includes the full record needed for review.
-
Evidence date is current
Confirm the evidence date falls within the required review cycle and is not stale.
-
Evidence source verified
Confirm the evidence came from the authoritative system, repository, or business process.
-
Evidence type selected
Select the evidence category that best describes the record.
Review and Approval
-
Reviewer name recorded
Enter the reviewer responsible for validating the evidence.
-
Review date recorded
Record the date the evidence was reviewed.
-
Review outcome
Select the review result for the evidence package.
-
Reviewer signature captured
Capture reviewer sign-off for audit traceability.
-
Next review date scheduled
Enter the next planned review date for this control evidence.
Deficiencies, Non-Conformances, and Remediation
-
Deficiency or non-conformance identified
Indicate whether any deficiency, gap, or non-conformance was found during review.
-
Deficiency description
Describe the deficiency, non-conformance, or missing evidence in specific terms.
-
Remediation owner recorded
Enter the person or team responsible for corrective action.
-
Remediation due date
Record the target date for completing corrective action.
-
Remediation status
Track the current status of the corrective action.
Audit Readiness and Sign-Off
-
Audit-ready package complete
Confirm the evidence log includes all required attachments, notes, and traceability for audit use.
-
Escalation required to ISMS manager
Indicate whether the issue must be escalated to the ISMS manager or compliance lead.
-
Final sign-off
Capture final approval for the evidence record and remediation status.
Ask AI
Template Studio