Geothermal Loop Purge and Antifreeze Commissioning Inspection
Geothermal Loop Purge and Antifreeze Commissioning Inspection
Commissioning inspection record for closed-loop ground source heat exchanger systems, documenting purge performance, debris removal, antifreeze concentration, pressure test results, and final loop readiness before connection to the building system.
Inspection Details
- Project / site name
-
Loop system identifier
Identify the ground loop, header, or manifold being inspected.
- Inspection date and time
- Inspector name and company
- Commissioning phase
Circuit Purge and Flushing Verification
- All circuits purged individually or in verified groups
-
Minimum flushing velocity achieved for each circuit
Record the measured flushing velocity for the slowest circuit and confirm it meets the project specification or manufacturer requirement.
- Number of circuits verified
- Air removed from loop
-
Debris collected during purge
Describe visible debris, sediment, pipe shavings, or other contaminants removed from the loop.
- Strainer or filter cleaned during purge
Antifreeze Mix Verification
- Antifreeze type
-
Measured antifreeze concentration
Enter the measured concentration by refractometer, hydrometer, or approved test method.
- Freeze protection verified against design minimum temperature
- Antifreeze solution mixed uniformly
- Test method used for concentration
Pressure, Flow, and Leak Check
-
Loop pressure at completion
Record the final stabilized loop pressure after purge and fill.
- Pressure test held for required duration
- No visible leaks at piping, fittings, valves, or headers
-
Pressure drop observed during hold
If applicable, record the measured pressure loss during the hold period.
Final Readiness and Sign-Off
- Loop flushed, filled, and ready for connection
-
Outstanding deficiencies or non-conformances
List any unresolved items, corrective actions, or follow-up requirements.
- Corrective action assigned
- Inspector signature