Gas Distribution Leak Survey Bar Hole Log
Gas Distribution Leak Survey Bar Hole Log
Field inspection log for documenting bar-hole and surface gas leak survey readings along gas distribution mains, including instrument verification, ppm or %LEL measurements, leak classification, and follow-up disposition.
Inspection Details and Survey Scope
- Survey date and start time recorded
- Survey route, main segment, or stationing identified
- Survey type selected
- Weather and ground conditions noted
- Survey performed by competent person or qualified technician
- Reference work order, map, or SOP documented
Instrument Verification and Calibration
- Gas detection instrument identified by make, model, and serial number
- Instrument bump test or functional check current
- Calibration date within required interval
- Measurement mode selected correctly
- Sampling probe, hose, or bar-hole adapter inspected for damage and leaks
Bar-Hole and Surface Readings
- Reading location recorded with stationing or offset
- Bar-hole depth or probe insertion depth recorded
- Peak gas reading recorded in ppm
- Peak gas reading recorded in % LEL
- Odor, hissing, dead vegetation, bubbling, or other leak indicators observed
- Adjacent structures, valves, services, or appurtenances checked
- Repeat reading taken when initial reading exceeded action threshold
Leak Classification and Immediate Actions
- Leak classification assigned
- Area secured or traffic/pedestrian controls established when needed
- Utility notification or escalation completed for confirmed leak
- Emergency response or excavation hold placed when required
Disposition, Corrective Action, and Sign-Off
- Follow-up disposition documented
- Corrective action details entered for any deficiency or non-conformance
- Inspector signature completed
- Supervisor review required for critical leak or failed instrument check