Formwork Inspection

Formwork Inspection

Inspection template for verifying formwork, shoring, bracing, tie spacing, and compliance with engineer-approved drawings before concrete placement.

Project and Drawing Verification

  • Project name, location, and pour area match the inspection scope
  • Latest engineer-approved formwork drawings are available on site
  • Formwork layout, member sizes, and support locations match the approved drawings
  • Any field changes have documented engineer approval before pour

Formwork Assembly and Structural Stability

  • Panels, walers, studs, and joists are properly aligned and securely connected
  • Formwork is plumb, level, and within project tolerance
  • All bearing surfaces are adequate and free from settlement, voids, or unstable ground
  • Formwork joints, corners, and closures are tight enough to prevent grout loss
  • Openings, blockouts, and penetrations are securely framed and supported
  • Formwork is free from visible damage, excessive deformation, or missing components

Shoring and Bracing

  • Shoring members are installed at the locations and spacing shown on the approved drawings
  • Shoring is bearing on adequate foundations, sole plates, or mud sills
  • Bracing is installed to prevent lateral movement, sway, or overturning
  • Shoring and reshores are not overloaded and are arranged per the approved sequence
  • Adjustable shores, jacks, and screw supports are locked or secured against movement
  • A competent person has verified the shoring and bracing condition before pour

Ties, Anchors, and Fasteners

  • Tie spacing matches the engineer-approved drawings
  • Ties, anchors, and connectors are fully engaged and properly tightened
  • No missing, bent, cracked, or visibly damaged ties, bolts, or hardware are present
  • Tie rods, cones, and washers are installed in the correct orientation and quantity
  • Formwork fasteners and connection hardware are compatible with the system being used

Pre-Pour Readiness and Sign-Off

  • Reinforcement, embeds, sleeves, and blockouts are installed and secured per the approved drawings
  • Debris, standing water, ice, and loose materials have been removed from the formwork area
  • Access, working platforms, and fall protection are in place where required
  • No unsafe conditions, active deficiencies, or unresolved non-conformances remain
  • Inspection approved for concrete placement
Ask AI Template Studio

Let's customize Formwork Inspection.

Tell me how you'd like to adapt it. For example:

  • Add a question about delivery time.
  • Make it shorter — 5 questions max.
  • Tailor it for the hospitality industry.
  • Translate the labels into Spanish.
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?