Formwork Inspection
Formwork Inspection
Inspection template for verifying formwork, shoring, bracing, tie spacing, and compliance with engineer-approved drawings before concrete placement.
Project and Drawing Verification
- Project name, location, and pour area match the inspection scope
- Latest engineer-approved formwork drawings are available on site
- Formwork layout, member sizes, and support locations match the approved drawings
- Any field changes have documented engineer approval before pour
Formwork Assembly and Structural Stability
- Panels, walers, studs, and joists are properly aligned and securely connected
- Formwork is plumb, level, and within project tolerance
- All bearing surfaces are adequate and free from settlement, voids, or unstable ground
- Formwork joints, corners, and closures are tight enough to prevent grout loss
- Openings, blockouts, and penetrations are securely framed and supported
- Formwork is free from visible damage, excessive deformation, or missing components
Shoring and Bracing
- Shoring members are installed at the locations and spacing shown on the approved drawings
- Shoring is bearing on adequate foundations, sole plates, or mud sills
- Bracing is installed to prevent lateral movement, sway, or overturning
- Shoring and reshores are not overloaded and are arranged per the approved sequence
- Adjustable shores, jacks, and screw supports are locked or secured against movement
- A competent person has verified the shoring and bracing condition before pour
Ties, Anchors, and Fasteners
- Tie spacing matches the engineer-approved drawings
- Ties, anchors, and connectors are fully engaged and properly tightened
- No missing, bent, cracked, or visibly damaged ties, bolts, or hardware are present
- Tie rods, cones, and washers are installed in the correct orientation and quantity
- Formwork fasteners and connection hardware are compatible with the system being used
Pre-Pour Readiness and Sign-Off
- Reinforcement, embeds, sleeves, and blockouts are installed and secured per the approved drawings
- Debris, standing water, ice, and loose materials have been removed from the formwork area
- Access, working platforms, and fall protection are in place where required
- No unsafe conditions, active deficiencies, or unresolved non-conformances remain
- Inspection approved for concrete placement