Fire Equipment Monthly Inspection
Fire Equipment Monthly Inspection
NFPA 10/25-aligned monthly inspection of portable fire extinguishers, sprinkler control valves, and fire pumps. Required for life-safety code compliance.
Inspection Details
- Inspection date and time recorded
- Inspector name and role
- Area / building / floor inspected
-
Inspection completed by competent person
Confirm the inspector is authorized and trained to perform this monthly fire equipment inspection.
Portable Fire Extinguishers
-
Extinguisher is present at designated location
Verify each extinguisher is installed where required by the site plan or fire protection layout.
-
Extinguisher is accessible and unobstructed
No storage, equipment, or other obstruction blocks immediate access.
- Extinguisher is mounted or stored in a visible location
-
Pressure gauge or indicator is in the operable range
For units with gauges or indicators, verify the reading is within the normal/operable zone.
- Safety pin and tamper seal are intact
- No visible damage, corrosion, leakage, or nozzle obstruction
-
Inspection tag or record is current
Monthly inspection documentation is present and up to date.
-
Extinguisher requires removal from service
Mark yes if any extinguisher is damaged, discharged, missing, blocked, or otherwise not ready for immediate use.
Sprinkler Control Valves
-
Control valve is in the normal open position
Verify the sprinkler control valve is positioned as required for service.
- Valve is accessible and not obstructed
- Valve is properly identified and labeled
-
Valve supervision device / seal / lock is intact
Verify any required supervisory seal, lock, or tamper indication is present and undisturbed.
- No visible leaks, damage, or abnormal condition
Fire Pumps
-
Fire pump is in normal service condition
Confirm the pump is not tagged out of service and is available for emergency operation.
- Pump controller indicates normal status
- Power supply / phase / alarm indicators show no fault condition
- Pump room is accessible and free of storage or obstructions
- No visible leaks, overheating, vibration, or abnormal noise
Deficiencies and Corrective Actions
-
Any deficiencies identified
Record any non-conformance, missing equipment, blocked access, damaged components, or out-of-service conditions.
-
Deficiency details and corrective action plan
Describe the deficiency, immediate risk, responsible party, and target completion date.
- Inspector signature