Electrical Trim-Out Inspection Checklist
Electrical Trim-Out Inspection Checklist
Inspection checklist for the electrical trim-out phase covering device and fixture installation, cover plates, luminaire mounting, panel directory labeling, and GFCI/AFCI function tests.
Inspection Details
- Project name and area inspected recorded
- Inspection date and time recorded
- Inspector name and trade/company recorded
- Work area is released for trim-out inspection and safe to access
Device Installation
- Receptacles installed securely, level, and flush with finished surface
- Switches installed securely, level, and operate without binding
- Device yokes, boxes, and mounting hardware are properly aligned and not damaged
- Devices are correctly identified by circuit and function where required
- Tamper-resistant, weather-resistant, or specialty devices match the specified location and application
Cover Plates and Finish
- Cover plates installed on all completed devices
- Cover plates are secure, uncracked, and properly sized for the device opening
- Openings, gaps, or unfinished penetrations around devices are sealed or corrected
- Finished surfaces around devices are free of visible damage caused during installation
Luminaires and Lighting Controls
- Luminaires are mounted securely and aligned per design intent
- Luminaires are free of visible damage, missing parts, or improper field modifications
- Lamps, trim rings, lenses, and diffusers are installed correctly
- Lighting controls, dimmers, occupancy sensors, and switches operate as intended
Panel Directory and Circuit Identification
- Panel directory is complete, legible, and matches actual circuit loads
- Circuit labels are permanent, specific, and not handwritten in a temporary manner unless approved
- Panel cover, deadfront, and directory area are clean, intact, and properly reinstalled
GFCI and AFCI Function Tests
- GFCI devices trip and reset properly using the test function
- AFCI devices trip and reset properly using the test function