Electrical Final Inspection Punch List
Electrical Final Inspection Punch List
Tracks open items from the AHJ final electrical inspection, assigns responsibility, documents corrective actions, and records re-inspection request dates through closeout.
Inspection Details
-
Project name and location recorded
Enter the project name, site address, and area inspected.
-
AHJ inspector name and agency recorded
Document the Authority Having Jurisdiction inspector and agency or department.
-
Final electrical inspection date recorded
Record the date and time of the final electrical inspection.
-
Inspection status selected
Select the current inspection outcome.
AHJ Open Items
-
Deficiency or non-conformance description
Describe the specific electrical deficiency exactly as observed or cited by the AHJ.
-
Code or standard reference
Record the applicable code, standard, permit note, or AHJ citation if provided.
-
Responsible party assigned
Identify the contractor, subcontractor, or individual responsible for correction.
-
Corrective action documented
Describe the corrective action required to resolve the deficiency.
-
Target completion date
Enter the planned date and time for completing the corrective action.
-
Photo evidence captured
Attach photos showing the deficiency or completed correction as applicable.
Electrical Safety and Code Compliance Review
-
Panelboards and equipment labeled and legible
Verify circuit directories, equipment labels, and disconnect identification are present and legible.
-
Open knockouts, unused openings, and exposed live parts secured
Confirm all enclosures are properly closed and no exposed energized parts are accessible.
-
Working clearances maintained at electrical equipment
Verify required access and working space are unobstructed around panels, disconnects, and switchgear.
-
Grounding and bonding deficiencies resolved
Confirm grounding, bonding, and equipment grounding conductor issues identified during inspection have been corrected.
-
Temporary wiring removed or approved for continued use
Verify temporary electrical installations are removed or documented as approved and compliant for continued use.
Closeout and Re-Inspection
-
Corrective actions verified complete
Confirm all cited deficiencies have been corrected and verified by the responsible party or inspector.
-
Re-inspection request date recorded
Record the date the re-inspection was requested from the AHJ.
-
AHJ re-inspection outcome recorded
Select the result of the re-inspection once completed.
-
Final closeout confirmed
Sign off when all electrical punch list items are closed and final approval is obtained.