Die and Tooling Changeover Verification (Extrusion)
Die and Tooling Changeover Verification (Extrusion)
Inspection template for verifying die mounting, alignment, purge, and first-piece quality after an extrusion profile changeover before releasing the line to production.
Inspection Details and Authorization
-
Changeover identification matches the active job, die, and tooling set
Record the product code, die number, tooling set, and line number being verified.
- Inspection performed by authorized setup or quality personnel
- Lockout-tagout applied and verified before die or tooling adjustments
- Area cleared for changeover verification and nonessential personnel excluded
Die Mounting and Mechanical Alignment
- Die is fully seated, secured, and fasteners are torqued to specification
- Die face, adapter, and tooling show no visible damage, galling, or contamination
- Die centerline is aligned to the line centerline within tolerance
- Bolts, clamps, and support hardware are present and properly installed
- Heaters, thermocouples, and temperature controls are connected and functioning
Purge, Cleanout, and Material Transition
- Previous polymer or alloy material has been fully purged from the die and barrel transition zone
- No visible buildup, carbonization, or degraded material remains at the die exit
- Purge material collected and disposed of according to site waste procedure
- Material transition completed without contamination, streaking, or color carryover
Startup Conditions and Safety Controls
- Machine guards, barriers, and access covers are installed before startup
- Emergency stop devices are accessible and functional
- Ventilation, fume extraction, or dust collection is operating as required for the material in use
- PPE required for startup verification is worn
First-Piece Quality Verification
-
First-piece profile dimensions are within specification
Enter the measured deviation from specification for the critical profile dimension, or use the site-defined measurement method.
- First-piece surface quality is acceptable with no burn marks, voids, tears, or die lines beyond limit
- Color, gloss, and appearance match the approved standard sample
- First-piece sample approved by quality or authorized release personnel
Release to Production
- Any deficiencies or non-conformances documented with corrective actions assigned
- Line released for production run
- Inspector signature