Loading...

Co-Extrusion Layer Ratio Verification Sheet

Co-Extrusion Layer Ratio Verification Sheet

Inspection template for verifying individual layer percentages and total structure on a multi-layer co-extrusion line against the job specification, including customer-required barrier and seal layers.

Inspection Details

  • Job number matches the production order
    Enter the job number and confirm it matches the active production order or traveler.
  • Product name and structure code confirmed
    Record the product name, structure code, or customer part number being verified.
  • Line, die, and run date/time recorded
    Document the co-extrusion line identifier, die set, and verification timestamp.

Job Spec and Material Match

  • Approved job specification available at point of use
  • Total layer structure matches the approved spec
    Confirm the number of layers and the specified structure order match the customer or internal specification.
  • Resin/material grade for each layer matches the spec
    Select any layer materials that were verified against the approved formulation or bill of materials.
  • Target layer ratio setpoints entered correctly
    Verify the control recipe or setpoints reflect the approved target percentages for each layer.

Layer Percentage Verification

  • Layer 1 percentage within acceptable tolerance
    Record the measured percentage for the first layer and compare it to the approved target.
  • Barrier layer percentage within acceptable tolerance
    Record the measured barrier layer percentage and confirm it meets the customer structure requirement.
  • Seal layer percentage within acceptable tolerance
    Record the measured seal layer percentage and confirm it meets the customer structure requirement.
  • Other specified layer percentages within acceptable tolerance
    Use this field for any additional layer percentage verification required by the job spec.
  • Total structure percentage equals 100%
    Confirm the total of all verified layer percentages equals the approved total structure.

Line Setup and Process Controls

  • Extruder feed rates match target ratios
    Verify each extruder feed rate or output setting is aligned to the approved layer ratio targets.
  • Melt temperatures within approved operating window
    Record the melt temperature used for the run and confirm it is within the approved process window.
  • Die and feedblock configuration matches the structure
    Confirm the installed die/feedblock configuration matches the layer sequence and customer structure.
  • Process alarms or deviations reviewed
    Confirm any active alarms, deviations, or adjustments were reviewed and documented before release.

Release and Attestation

  • Non-conformances documented and contained
    Record any deficiency, hold action, scrap, or rework disposition if the structure did not match the job spec.
  • Product released for production or shipment
    Confirm release only after the verified structure meets the approved specification.
  • Inspector signature
    Inspector attestation that the verification was completed accurately.
Ask AI Template Studio

Let's customize Co-Extrusion Layer Ratio Verification Sheet.

Tell me how you'd like to adapt it. For example:

  • Add a question about delivery time.
  • Make it shorter — 5 questions max.
  • Tailor it for the hospitality industry.
  • Translate the labels into Spanish.
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?