Loading...

Run: Co-Extrusion Layer Ratio Verification Sheet

Verify each co-extruded layer matches the approved job spec before product is released. This sheet captures layer percentages, material grades, process setti...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Inspection Details

Enter the job number and confirm it matches the active production order or traveler.
Record the product name, structure code, or customer part number being verified.
Document the co-extrusion line identifier, die set, and verification timestamp.

Job Spec and Material Match

Confirm the number of layers and the specified structure order match the customer or internal specification.
Select any layer materials that were verified against the approved formulation or bill of materials.
Verify the control recipe or setpoints reflect the approved target percentages for each layer.

Layer Percentage Verification

Record the measured percentage for the first layer and compare it to the approved target.
Record the measured barrier layer percentage and confirm it meets the customer structure requirement.
Record the measured seal layer percentage and confirm it meets the customer structure requirement.
Use this field for any additional layer percentage verification required by the job spec.
Confirm the total of all verified layer percentages equals the approved total structure.

Line Setup and Process Controls

Verify each extruder feed rate or output setting is aligned to the approved layer ratio targets.
Record the melt temperature used for the run and confirm it is within the approved process window.
Confirm the installed die/feedblock configuration matches the layer sequence and customer structure.
Confirm any active alarms, deviations, or adjustments were reviewed and documented before release.

Release and Attestation

Record any deficiency, hold action, scrap, or rework disposition if the structure did not match the job spec.
Confirm release only after the verified structure meets the approved specification.
Inspector attestation that the verification was completed accurately.

Get your results

Enter your email — we'll send you a PDF of your filled-out template, plus the occasional MangoScoop newsletter (templates, workflow tips, product updates). Unsubscribe anytime — link is in every email.

Generated with MangoApps Templates — browse 250+ free
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?