Certificate of Occupancy Readiness Checklist
Certificate of Occupancy Readiness Checklist
Pre-request readiness inspection to confirm all trade finals, required certifications, life-safety systems, and outstanding corrections are complete before applying for a Certificate of Occupancy.
Project Closeout and Scope Verification
- Approved permit set and latest plan revisions are available on site
- Inspection area matches the permitted scope of work
- All open punch-list items are documented with assigned owners and target completion dates
- Temporary barriers, construction debris, and unused materials have been removed from occupied paths
Trade Finals and Permit Sign-Offs
- Building final inspection completed or approved by the AHJ
- Electrical final inspection completed with no unresolved deficiencies
- Mechanical/HVAC final inspection completed with equipment operating as intended
- Plumbing final inspection completed with fixtures, drains, and shutoffs functional
- Fire alarm, sprinkler, and fire protection finals completed and documented
Life-Safety and Egress Readiness
- Required exit routes are clear, illuminated, and unobstructed
- Exit signage is installed, visible, and directional where required
- Emergency lighting test passed and fixtures are operational
- Fire extinguishers are mounted, accessible, tagged, and within inspection date
- Any required fire alarm monitoring or emergency communication systems are active
Utilities, Equipment, and Operational Systems
- Permanent electrical power is available for intended occupancy areas
- Domestic water service is active and fixtures deliver potable water where required
- HVAC systems are commissioned and maintain acceptable operating conditions
- Elevators, lifts, or accessibility equipment required for occupancy are tested and approved
Documentation, Certifications, and AHJ Package
- As-built drawings, O&M manuals, and warranty documents are compiled
- Special inspection reports and engineer letters of completion are included where required
- Required certificates, test reports, and commissioning records are signed and dated
- Application package for Certificate of Occupancy is ready for submission to the AHJ
Final Corrections and Sign-Off
- All critical deficiencies have been corrected and rechecked
- Remaining non-conformances are documented with a corrective action plan
- Project is ready to request Certificate of Occupancy
- Inspector signature