Cathodic Protection Annual Pipe-to-Soil Survey
Cathodic Protection Annual Pipe-to-Soil Survey
Annual inspection template for recording pipe-to-soil potential readings on steel gas and water mains and verifying cathodic protection performance against the -0.85 V CSE criterion per NACE SP0169, with corrective action tracking for deficiencies and non-conformances.
Inspection Details
- Survey date and time recorded
- Inspector name and company recorded
-
Pipeline asset identified
Include pipeline name, segment, stationing, or test station ID.
- Asset type selected
- Survey method documented
- Weather and soil conditions noted
-
Reference standard noted
Verify readings against the -0.85 V CSE criterion used for cathodic protection evaluation per NACE SP0169.
Reference Electrode and Test Setup
- Reference electrode type confirmed
-
Reference electrode condition acceptable
Electrode is clean, intact, and suitable for field use.
- Lead connections secure and free of damage
-
Test equipment calibration current
Record the most recent calibration or verification date for the voltmeter or data logger.
-
Measurement setup free of obvious interference
Confirm no obvious electrical interference, poor contact, or unsafe access conditions affected the reading.
Pipe-to-Soil Potential Readings
-
Measurement point 1 location
Identify the test station, milepost, valve box, or accessible point.
-
Measurement point 1 pipe-to-soil potential
Enter the stabilized pipe-to-soil potential reading referenced to CSE.
- Measurement point 1 meets -0.85 V CSE criterion
-
Measurement point 2 location
Use additional points as needed for the survey route.
- Measurement point 2 pipe-to-soil potential
- Measurement point 2 meets -0.85 V CSE criterion
-
Additional readings documented
Record any additional pipe-to-soil readings, including location, value, and notable conditions.
Deficiencies and Corrective Actions
- Deficiencies identified
- Corrective action required
-
Corrective action details
Describe repairs, retest requirements, or escalation to corrosion engineering or the AHJ.
-
Follow-up due date
Enter the target date/time for retest or corrective action completion.
Sign-Off
- Survey record reviewed for completeness
- Inspector signature
-
Supervisor or corrosion engineer review
Use when internal procedure requires technical review or approval.