AWWA C600 Water Main Hydrostatic Test Report

AWWA C600 Water Main Hydrostatic Test Report

Inspection template for documenting acceptance testing of a new water main in accordance with ANSI/AWWA C600, including a two-hour hydrostatic hold at test pressure, allowable leakage calculation, observed leakage, and inspector sign-off.

Test Identification

  • Project name and test segment identified
    Record the project name, test location, pipe segment limits, and stationing or drawing reference.
  • Test date and start time recorded
    Document when the hydrostatic test began.
  • Inspector and contractor representatives identified
    Record names and roles of the inspector, contractor representative, and any witnessing authority.

Main and Test Segment Details

  • Pipe material, diameter, and length recorded
    Document pipe material, nominal diameter, and total test length for the segment.
  • Appurtenances and fittings included in test segment
    Select all items included in the test section.
  • Test section isolated and restrained
    Verify the main is isolated, restrained, and ready for pressure testing without unintended movement.

Pre-Test Readiness and Safety

  • Test equipment calibrated and suitable for test pressure
    Verify gauges, pumps, hoses, and fittings are in serviceable condition and appropriate for the required pressure range.
  • Test pressure gauge reading recorded
    Record the stabilized gauge reading used for the test.
  • Work area controlled and safe for inspection
    Verify access control, traffic control, and PPE are in place; no unsafe conditions are present during pressurization.

Hydrostatic Test Execution

  • Test pressure maintained for required two-hour hold
    Confirm the main was held at the specified test pressure for a continuous two-hour period in accordance with the acceptance procedure.
  • Start and end pressure recorded
    Document the pressure at the start and end of the hold period, including any observed fluctuations.
  • Observed leakage during hold
    Record the measured leakage observed during the test hold period.

Leakage Calculation and Acceptance

  • Allowable leakage calculated and documented
    Record the allowable leakage calculation used for the test, including the basis and any formula inputs.
  • Observed leakage within allowable limit
    Confirm the measured leakage did not exceed the allowable leakage for the test segment.
  • Test result accepted
    Mark whether the water main hydrostatic test is accepted based on pressure hold and leakage criteria.

Deficiencies, Corrective Actions, and Sign-Off

  • Deficiencies or non-conformances documented
    Record any leaks, pressure loss, equipment issues, or other non-conformances observed during the test.
  • Corrective actions completed or scheduled
    Describe repairs, retesting requirements, or follow-up actions needed before acceptance.
  • Inspector signature
    Inspector signs to confirm the record is complete and accurate.
Ask AI Template Studio

Let's customize AWWA C600 Water Main Hydrostatic Test Report.

Tell me how you'd like to adapt it. For example:

  • Add a question about delivery time.
  • Make it shorter — 5 questions max.
  • Tailor it for the hospitality industry.
  • Translate the labels into Spanish.
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?