As-Built Drawing Submission Audit

As-Built Drawing Submission Audit

Inspection template for verifying as-built drawing and O&M submission completeness and quality at project closeout.

Inspection Details and Submission Scope

  • Project name, contract number, and closeout package identified
  • Submission scope matches contract, specifications, and approved turnover requirements
  • Latest revision date and submission version are clearly stated
  • Responsible contractor, designer, and reviewer contacts listed

As-Built Drawing Completeness

  • All required drawing sheets included in the submission
  • Field changes, deviations, and approved RFIs are incorporated into the drawings
  • Dimensions, elevations, routing, and equipment locations match observed installed conditions
  • Drawing legends, symbols, abbreviations, and notes are consistent and readable
  • Discipline coordination is resolved with no obvious clashes or conflicting information
  • Redlines, markups, and source field verification records are available

Drawing Quality and Record Control

  • Sheet titles, drawing numbers, and revision blocks are complete and accurate
  • Scale, north arrow, and key plan are present where applicable
  • PDF or record set is legible at normal zoom without missing pages or corruption
  • Record set is clearly marked as 'As-Built', 'Record Drawing', or equivalent closeout designation

O&M Manual Completeness

  • Manufacturer O&M manuals are included for all required equipment and systems
  • Startup, commissioning, and test reports are included where required
  • Maintenance schedules, service intervals, and recommended consumables are documented
  • Warranty information, warranty start dates, and vendor contact details are included
  • Spare parts lists, special tools, and replacement part numbers are provided
  • Operation instructions are clear enough for facility staff to use without clarification

Asset Data, Compliance, and Safety References

  • Asset tags, equipment IDs, and serial numbers are captured consistently
  • Required fire-life-safety documentation is included where applicable (e.g. NFPA 1, NFPA 70E, NFPA 101 references)
  • Applicable OSHA construction closeout or safe-access requirements are addressed in the submission package
  • Required permits, certificates, approvals, or AHJ sign-offs are included where applicable

Closeout Acceptance and Corrective Actions

  • All deficiencies and non-conformances are logged with clear corrective actions
  • Responsible party and due date assigned for each open item
  • Submission is acceptable for turnover or resubmission is required
  • Inspector sign-off completed
Ask AI Template Studio

Let's customize As-Built Drawing Submission Audit.

Tell me how you'd like to adapt it. For example:

  • Add a question about delivery time.
  • Make it shorter — 5 questions max.
  • Tailor it for the hospitality industry.
  • Translate the labels into Spanish.
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?