As-Built Drawing Submission Audit
As-Built Drawing Submission Audit
Inspection template for verifying as-built drawing and O&M submission completeness and quality at project closeout.
Inspection Details and Submission Scope
- Project name, contract number, and closeout package identified
- Submission scope matches contract, specifications, and approved turnover requirements
- Latest revision date and submission version are clearly stated
- Responsible contractor, designer, and reviewer contacts listed
As-Built Drawing Completeness
- All required drawing sheets included in the submission
- Field changes, deviations, and approved RFIs are incorporated into the drawings
- Dimensions, elevations, routing, and equipment locations match observed installed conditions
- Drawing legends, symbols, abbreviations, and notes are consistent and readable
- Discipline coordination is resolved with no obvious clashes or conflicting information
- Redlines, markups, and source field verification records are available
Drawing Quality and Record Control
- Sheet titles, drawing numbers, and revision blocks are complete and accurate
- Scale, north arrow, and key plan are present where applicable
- PDF or record set is legible at normal zoom without missing pages or corruption
- Record set is clearly marked as 'As-Built', 'Record Drawing', or equivalent closeout designation
O&M Manual Completeness
- Manufacturer O&M manuals are included for all required equipment and systems
- Startup, commissioning, and test reports are included where required
- Maintenance schedules, service intervals, and recommended consumables are documented
- Warranty information, warranty start dates, and vendor contact details are included
- Spare parts lists, special tools, and replacement part numbers are provided
- Operation instructions are clear enough for facility staff to use without clarification
Asset Data, Compliance, and Safety References
- Asset tags, equipment IDs, and serial numbers are captured consistently
- Required fire-life-safety documentation is included where applicable (e.g. NFPA 1, NFPA 70E, NFPA 101 references)
- Applicable OSHA construction closeout or safe-access requirements are addressed in the submission package
- Required permits, certificates, approvals, or AHJ sign-offs are included where applicable
Closeout Acceptance and Corrective Actions
- All deficiencies and non-conformances are logged with clear corrective actions
- Responsible party and due date assigned for each open item
- Submission is acceptable for turnover or resubmission is required
- Inspector sign-off completed