AMI Smart Meter Field Exchange Audit
AMI Smart Meter Field Exchange Audit
Inspection template for documenting the field exchange of a legacy meter for an AMI smart meter, including final read, new meter read, communication confirmation, installation quality, and site condition.
Audit Context
- Work order, service address, and audit date are recorded
- Legacy meter serial number is documented
- AMI meter serial number is documented
- Technician name or ID is recorded
- Exchange type matches the work order scope
- Site access was available for safe completion of the work
Meter Removal and Final Read
- Final read from the legacy meter was captured
- Final read timestamp was recorded
- Legacy meter condition at removal was documented
- Removed meter was secured and handled per utility procedure
- Any discrepancy between expected and observed final read was explained
- Photo evidence of the removed meter and final read was captured
New AMI Meter Installation
- New meter is correctly oriented and fully seated
- Meter socket, jaws, and connections show no visible damage or overheating
- New meter initial read was captured
- New meter serial number matches the installed unit
- Tamper seal or locking mechanism is installed correctly
- Installation photo of the new meter was captured
Communication and Data Validation
- Meter communication status is confirmed
- Initial AMI read was successfully transmitted or queued
- Time, date, and meter ID are consistent across the field record
- Any communication issue was escalated per procedure
Site Condition and Safety
- Work area was left clean and free of debris
- Meter area remained accessible and unobstructed after completion
- No visible safety deficiency was observed at the site
- Any site condition requiring follow-up was documented