Unidirectional Flushing Run Data Collection Form
Unidirectional Flushing Run Data Collection Form
Captures operational data for each unidirectional flushing run, including valve sequencing, target velocity, chlorine residual, turbidity, and completion notes.
Run Identification
-
Run Date
Date the flushing run was performed.
-
Run Start Time
Time the flushing run began.
-
Run End Time
Time the flushing run ended, if completed.
-
System Zone / Area
Identify the flushing zone, pressure district, or area served.
-
Hydrant or Outlet ID
Unique identifier for the flushing point.
-
Run Status
Current status of this flushing run.
Valve Sequencing and Operations
-
Valve Sequence Summary
Briefly describe the valve opening and closing sequence used for this run.
-
Upstream Valves Opened
Select all upstream valves opened for the run.
-
Downstream Valves Closed
Select all downstream valves closed to direct flow.
-
Total Valves Adjusted
Number of valves opened, closed, or otherwise adjusted during the run.
Flushing Performance
-
Target Velocity
Planned flushing velocity for the run.
-
Target Velocity Units
Units used for the target velocity.
-
Actual Velocity
Observed flushing velocity achieved during the run.
-
Actual Velocity Units
Units used for the actual velocity.
-
Flushing Duration (Minutes)
Total active flushing time for the run.
Water Quality Measurements
-
Chlorine Residual Type
Select the residual type measured.
-
Chlorine Residual Value
Measured chlorine residual value.
-
Chlorine Residual Units
Units used for the chlorine residual measurement.
-
Turbidity Value
Measured turbidity value, if collected.
-
Turbidity Units
Units used for turbidity measurement.
Exceptions and Completion Notes
-
Exceptions Observed?
Indicate whether any exceptions, issues, or deviations occurred.
-
Exception Details
Describe any operational issues, corrective actions, or deviations from the planned sequence.
-
Completion Notes
Add any final notes, observations, or follow-up actions.