Energized Electrical Work Permit - Utility Substation
Energized Electrical Work Permit - Utility Substation
Permit form for authorized energized work on utility substation equipment that cannot be de-energized, capturing justification, shock and arc flash analysis, PPE, controls, and required approvals.
Permit and Work Request
- Permit title
- Work order number
- Planned work date
- Substation name
-
Equipment / circuit identifier
Identify the specific energized equipment, bay, feeder, breaker, transformer, bus, or circuit involved.
- Type of work
-
Work scope summary
Briefly describe the task and the energized components involved. Do not include unnecessary PII.
Energized Work Justification
- Can the equipment be de-energized before work begins?
-
Justification for energized work
Explain why de-energization is not feasible and what operational, reliability, or safety constraints apply.
- Alternative methods reviewed
- Reason the energized risk is acceptable for this task
Shock and Arc Flash Analysis
-
Nominal system voltage (kV)
Enter the nominal voltage of the energized equipment.
-
Shock approach boundary (ft or m)
Enter the applicable shock boundary distance used for the job plan.
-
Arc flash boundary (ft or m)
Enter the arc flash boundary distance from the study or field assessment.
-
Available fault current
Enter the available fault current used for the hazard analysis.
-
Protective device settings reviewed?
Confirm the protective device settings, relay coordination, and operating condition were reviewed.
- Arc flash label verified in the field?
-
Hazard analysis reference
Optional reference to the study, drawing, or report used for this permit.
PPE and Work Controls
- Required PPE
- Arc rating of clothing (cal/cm²)
- Are insulated tools required?
- Barriers and warning signs in place?
- Additional controls
- Electrical rescue plan available?
Crew Qualifications and Pre-Job Briefing
- Qualified person in charge
- Crew size
- Pre-job briefing completed?
- Briefing topics covered
- Crew acknowledged stop-work authority?
Approvals and Authorization
- Requester name
- Requester title
- Safety review approved?
- Operations manager approval
- Electrical authority approval
- Approval comments