Construction Site Hot Work Permit
Construction Site Hot Work Permit
Permit form for authorizing cutting, welding, grinding, and other hot work on a construction site, including fire watch assignment, pre-work controls, and post-work monitoring.
Permit Request Details
- Permit Title
- Work Order or Job Number
-
Site Location
Specify the building, floor, area, or zone where hot work will occur.
- Permit Start Date
- Permit End Date
- Type of Hot Work
- If Other, describe the hot work activity
Work Scope and Equipment
- Work Description
- Equipment to Be Used
- If Other, describe the equipment
- Has the work area been isolated from unauthorized access?
Fire Prevention Controls
- Combustible materials have been removed or protected from the work area
- Are flammable liquids, gases, or vapors present in the area?
- Fire blankets, welding screens, or spark barriers are in place
- Floor openings, wall openings, and concealed spaces are protected from spark travel
- Ventilation is adequate for the planned hot work
- A suitable fire extinguisher is immediately available at the work site
Fire Watch Assignment
- Is a fire watch required for this permit?
-
Fire Watch Assigned
Enter the assigned person's name or role title.
- Fire Watch Start Time
-
Fire Watch End Time
Enter the end time after the required post-work monitoring period.
- Required Post-Work Monitoring Period
- If Other, specify the monitoring period
Approval, Consent, and Submission
- I acknowledge that hot work may begin only after approval and all controls are in place.
-
Submitted By
Enter the name or role of the person requesting the permit.
-
Contact Email
Optional. Provide only if needed for permit follow-up.
- Additional Notes