Loading...

Run: Welding Fume Extraction Audit

Audit welding fume extraction at the hood, airflow, and filter level so you can catch weak capture, clogged filters, and unsafe setups before welding continues.

Fill this out, get a PDF emailed to you. No sign-up required. Want to run it with your team and track results? Sign up free →

Inspection Details

Record the date or reference of the most recent airflow or performance test, if available.

Hood Placement and Capture Zone

Verify the hood is placed to capture fumes at or near the point of generation without obstructing the work.
Check that the hood face is not blocked by tools, fixtures, cables, or the workpiece and is aligned to intercept the rising fume plume.
Inspect for loose joints, crushed ducting, tears, missing clamps, or damaged support arms that could reduce capture efficiency.
Confirm the hood placement allows the welder to maintain safe posture, visibility, and access to the workpiece.

Airflow and Capture Performance

Record the measured capture velocity at the hood face or specified test point and compare it to the site standard or manufacturer requirement.
Verify the system airflow indicator, manometer, or gauge is within the normal operating range specified by the manufacturer or site procedure.
Observe active welding conditions to confirm the plume is being captured before it enters the welder's breathing zone.
Check for abnormal fan noise, vibration, or airflow pulsation that may indicate blockage, imbalance, or mechanical failure.

Filter Condition and Maintenance

Inspect pre-filters and main filters for excessive loading, tears, bypass leakage, collapsed media, or other visible defects.
Confirm filters have been cleaned or replaced according to the maintenance schedule and manufacturer instructions.
Record the filter differential pressure or clogging indicator reading and compare it to the acceptable operating range.

Documentation and Corrective Actions

Verify the system has documented annual testing or performance verification where required by site procedure or regulatory program.
Record any non-conformance, responsible person, and due date for repair, adjustment, cleaning, or retesting.
Based on the inspection results, determine whether the extraction system is fit for continued use or requires immediate shutdown and repair.

Get your results

Enter your email — we'll send you a PDF of your filled-out template. We won't sign you up to anything; you can opt in to the trial from the email if you want.

Generated with MangoApps Templates — browse 240+ free
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?