Loading...

Run: Steel Erection Pre-Lift Inspection

Use this Steel Erection Pre-Lift Inspection template to verify connector access, decking stability, and perimeter fall protection before the lift starts. It ...

Fill this out, get a PDF emailed to you. No sign-up required. Want to run it with your team and track results? Sign up free →

Pre-Lift Planning and Competent Person Review

Confirm a competent person has reviewed the erection sequence, access, and fall hazards before the lift begins.
Verify the crew has been briefed on the planned sequence, connection points, and safe positioning for connectors.
Confirm wind, precipitation, visibility, and ground conditions do not create an unsafe condition for steel erection.
Verify bolts, drift pins, tools, and other materials are staged to prevent dropped-object hazards and unnecessary exposure at elevation.
Confirm the communication method is understood and available for the lift and placement sequence.

Connector Procedures and Access

Verify access to the connection point is unobstructed and does not expose workers to unnecessary fall or trip hazards.
Confirm the connection area provides stable footing and a safe working position for the connector.
Verify required fall protection measures are installed and usable for connector work at height.
Confirm bolts, washers, and other connection hardware are available and appropriate for the steel members being installed.
Verify the load and adjacent members are controlled and aligned before connectors begin work.

Decking and Working Surface

Confirm decking panels or bundles are staged to minimize handling hazards and prevent shifting or sliding.
Verify decking is fastened or otherwise secured so it cannot shift, slide, or become dislodged during work.
Check for unprotected openings, gaps, or penetrations that could create a fall hazard.
Verify the surface is reasonably clear of debris, oil, ice, or other conditions that could cause a slip or trip.
Confirm the planned installation sequence does not create an unstable condition for workers or the structure.

Perimeter Protection and Fall Hazard Controls

Verify guardrails, safety nets, personal fall arrest systems, or other required controls are in place for exposed edges.
Confirm exposed edges and openings are visibly marked or controlled to prevent inadvertent exposure.
Check that the protection system is continuous around exposed areas and has not been removed or left incomplete.
Verify anchorage points, if part of the protection plan, are suitable for the intended use and accessible to the crew.

Housekeeping, Tools, and Closeout

Confirm hand tools, fasteners, and small parts are secured to prevent dropped-object hazards.
Verify the drop zone is controlled to keep unauthorized personnel out of the hazard area.
Record any deficiency, non-conformance, or corrective action needed before the lift proceeds.

Get your results

Enter your email — we'll send you a PDF of your filled-out template. We won't sign you up to anything; you can opt in to the trial from the email if you want.

Generated with MangoApps Templates — browse 240+ free
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?