Loading...

Run: Planogram Reset Compliance Audit

Use this Planogram Reset Compliance Audit to verify the reset was built correctly: tags, facings, shelf position, documentation, and sign-off. It helps catch...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Audit Setup and Reset Documentation

Verify the reset date/time is recorded and aligns with the approved reset schedule or store communication.
Record the associate, department lead, or manager who completed the reset.
Confirm the current planogram, reset guide, or merchandising instruction is available for comparison.
Verify the audit is being performed on the intended section, bay, or fixture identified in the reset instructions.

Section Tag and Label Accuracy

Section header or tag should reflect the correct category, subcategory, and location for the reset.
Shelf tags, labels, and any strip signage should be readable, current, and aligned to the correct products.
Verify the tag, SKU, UPC, or item code corresponds to the product directly associated with that shelf position.
No obsolete, torn, or missing section tags should remain after the reset.

Shelf Position and Product Facing Compliance

Each SKU should be located in the exact shelf, slot, or peg position specified by the planogram.
Enter the observed number of facings for the audited product group.
Confirm the number of facings on the shelf meets the approved reset standard.
Products should be fully stocked to the required depth and aligned so the front row presents evenly.
No unauthorized, discontinued, or misplaced items should remain in the audited section.

Merchandising Presentation and Area Condition

Products should be fronted, aligned, and presented consistently across the section.
Customers and associates should be able to access the section without blocked pathways or unsafe clutter.
Record any fixture damage that could affect planogram compliance or product presentation.

Final Verification and Sign-Off

Confirm there are no critical non-conformances remaining in the audited section.
Document the action owner and next step for each deficiency or non-conformance.
Inspector or auditor signs off to confirm the audit was completed.

Get your results

Enter your email — we'll send you a PDF of your filled-out template, plus the occasional MangoScoop newsletter (templates, workflow tips, product updates). Unsubscribe anytime — link is in every email.

Generated with MangoApps Templates — browse 250+ free
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?