Loading...

Run: Door Hardware Pre-Drill and Lock Bore Inspection

Inspect machined door slabs and frames before hardware installation to catch bore, mortise, and strike prep errors early. Use it to prevent fit failures, rew...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Inspection Setup and Traceability

Record the unique identifier, opening number, or part number and confirm it matches the approved drawing or hardware schedule.
Confirm required tools are available and appropriate for the measured features, such as calipers, tape, bore gauge, depth gauge, and square.
Enter the drawing revision, hardware template, or SOP used for this inspection.

Lock Bore and Edge Prep Dimensions

Measure the main lock bore diameter and compare it to the approved hardware preparation requirement.
Measure from the door edge to the bore centerline and verify it matches the required backset.
Verify the bore centerline is aligned to the door edge and the prep is not visibly out of square or offset.
Measure the latch edge bore diameter and depth against the specified hardware prep.

Hinge Mortise and Door Edge Preparation

Measure hinge location from the top or bottom of the door and verify it matches the approved layout.
Measure mortise depth and width to confirm the hinge leaf seats flush without overcut or proud condition.
Inspect all machined prep areas for damage that would affect hardware fit or finish.

Strike Prep and Frame Alignment

Measure the strike cutout location and verify it aligns with the latch centerline and approved frame prep.
Measure strike opening width, height, and depth as applicable for the installed hardware set.
Verify the frame cutout is free of burrs, debris, deformation, or interference that would prevent proper strike installation.

Fit Verification and Disposition

Perform a dry fit or template check where applicable to confirm the lockset, latch, hinges, and strike can be installed without binding.
Record any deficiency, measured deviation, and disposition such as rework, hold, or accept-as-is with approval.
Inspector signs to confirm the door or frame prep is acceptable for release.

Get your results

Enter your email — we'll send you a PDF of your filled-out template, plus the occasional MangoScoop newsletter (templates, workflow tips, product updates). Unsubscribe anytime — link is in every email.

Generated with MangoApps Templates — browse 250+ free
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?