Loading...

Run: Cargo Tank Closed Gauging Verification

Verify cargo tank closed gauging on LPG and other liquefied gas tanks, document any slip-tube or vapor-release deficiency, and capture corrective actions in ...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Inspection Scope and Vessel Identification

Record the tank number, cargo system identifier, and inspection location.
Confirm the cargo being inspected requires closed gauging controls under the applicable cargo system rules.
Verify the applicable cargo system procedure, IGC Code reference, and shipboard operating instructions are available to the inspector.
Document whether the tank is in service, idle, inerted, or under maintenance at the time of inspection.

Closed Gauging Arrangement

Confirm the tank is equipped with and using a closed gauging arrangement for level measurement.
Verify no slip-tube arrangement is being used in a manner that would release LPG to atmosphere.
Confirm restricted gauging, if present, does not create an open release path to atmosphere during measurement.
Inspect the gauging point, seals, fittings, and covers for visible damage, leakage, or missing components.
Check for visible vapor release, odor, frosting, or other signs of product escaping during measurement.

Operational Controls and Safety Practices

Confirm the operating procedure prohibits open gauging or any method that vents LPG to atmosphere.
Verify required PPE is available and in use for the task, including eye and face protection as applicable to the site procedure.
Confirm the area is controlled to prevent ignition sources, unnecessary exposure, or unauthorized access during gauging.
Record leaks, damaged fittings, procedural deviations, or other non-conformances observed during the inspection.

Compliance Evidence and Corrective Action

Attach photos when a deficiency, leak, damaged seal, or prohibited gauging arrangement is observed.
Record the applicable IGC Code reference, company procedure, or terminal/vessel instruction used for the inspection.
Confirm corrective action has been initiated for any failed critical item, including isolation, repair, or operational توقف as required by procedure.
Inspector attestation that the closed gauging verification was completed accurately.

Get your results

Enter your email — we'll send you a PDF of your filled-out template, plus the occasional MangoScoop newsletter (templates, workflow tips, product updates). Unsubscribe anytime — link is in every email.

Generated with MangoApps Templates — browse 250+ free
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?