Loading...

Run: Agent Occupancy and Idle Time Review

Review interval-level agent occupancy and idle time against the 80% to 85% target band, then document staffing imbalances, root causes, and follow-up actions...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Inspection Details

Record the date/time of the review and the interval window covered by the inspection.
Identify the team, queue, site, or operational group being reviewed.
Document the workforce management report, BI dashboard, or system source used for the review.
Capture the inspector's name and role for audit traceability.
Confirm the inspection covers the correct intervals, date range, and operational scope.

Occupancy and Idle Time Metrics

Enter the measured occupancy rate for the interval being reviewed.
Enter the idle time percentage for the interval being reviewed.
Record the variance from the 80% to 85% target band, if applicable.
Confirm whether any intervals fell below the lower target threshold.
Confirm whether any intervals exceeded the upper target threshold.

Workload Balance and Staffing Conditions

Select any observed indicators such as queue growth, missed breaks, extended after-call work, or sustained high handle pressure.
Select any observed indicators such as prolonged idle states, underutilized staffing, or repeated schedule gaps.
Confirm whether late logins, early logouts, aux-code misuse, or schedule non-adherence distorted the occupancy calculation.
Confirm whether staffing levels were aligned to forecasted contact or workload demand for the reviewed intervals.
Confirm whether non-productive time was scheduled to avoid unnecessary spikes in occupancy or idle time.

Exceptions, Root Cause, and Corrective Action

Select the most likely root cause when intervals fall outside the target band.
Document the action plan for intervals below 80% or above 85%, such as reforecasting, schedule changes, coaching, or staffing adjustments.
Confirm whether the exception requires escalation due to sustained overwork, repeated idle time, or material service risk.
Identify the person or team responsible for follow-up actions.
Record the due date and time for corrective action review.

Review Summary and Sign-Off

Select the final outcome of the inspection.
Summarize the main findings, including intervals outside the target band and notable trends.
Inspector sign-off confirming the review is complete and accurate.

Get your results

Enter your email — we'll send you a PDF of your filled-out template, plus the occasional MangoScoop newsletter (templates, workflow tips, product updates). Unsubscribe anytime — link is in every email.

Generated with MangoApps Templates — browse 250+ free
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?