Loading...

Run: Subsurface Utility Engineering Quality Level A Test Hole Report

A Subsurface Utility Engineering Quality Level A Test Hole Report template for documenting pothole findings, exposed utility details, and surveyed coordinate...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Submission Notice

Date the test hole was completed or documented.
Optional. Enter only if needed for follow-up or audit trail.
Optional. Used only for follow-up questions.

Test Hole Location

Describe the work area, stationing, nearby landmarks, or cross streets.

Utility Exposure Details

Measured Dimensions

Depth from finished grade to the exposed utility or bottom of the test hole.
Enter if the utility is round or cylindrical.
Enter if the utility is flat, rectangular, or otherwise better described by width.
Enter if needed to describe the exposed utility profile.

Survey Coordinates

Enter the surveyed eastings, northings, or other horizontal coordinate value as used by the project.
Enter the surveyed elevation or vertical coordinate value as used by the project.

Attachments and Notes

Include any relevant observations, discrepancies, or limitations.
Confirm the record was checked for completeness and coordinate consistency.

Get your results

Enter your email — we'll send you a PDF of your filled-out template, plus the occasional MangoScoop newsletter (templates, workflow tips, product updates). Unsubscribe anytime — link is in every email.

Generated with MangoApps Templates — browse 250+ free
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?