Cell Tower Generator Preventive Maintenance SOP
Cell Tower Generator Preventive Maintenance SOP
Standard operating procedure for performing preventive maintenance on a cell tower generator, including fluid checks, battery inspection, auto-start verification, fuel polishing, and load testing.
Steps
- Verify site access and maintenance authorization
- Review the generator maintenance record and site-specific hazards
- Inspect the work area and control immediate hazards
- Confirm the generator is in the correct operating state for maintenance
- Verify auto-start and alarm response without interrupting service
- Inspect engine fluids and record levels
- Inspect battery condition and connections
- Inspect fuel system condition and determine whether fuel polishing is required
- Perform or schedule fuel polishing
- Run the load test at the approved test level
- Record findings, deviations, and non-conformance
- Escalate unresolved defects and close the work order