Wiring Harness Continuity and Hi-Pot Test Inspection
Wiring Harness Continuity and Hi-Pot Test Inspection
Inspection template for documenting continuity and insulation (hi-pot) testing of control wiring harnesses before installation in assembled equipment, to catch wiring faults early and verify electrical integrity.
Inspection Details
-
Harness identification recorded
Record harness part number, assembly number, revision, and serial or lot number.
-
Work order and test traveler available
Verify the correct work order, drawing, and test traveler are present and match the harness being inspected.
-
Inspector and test date recorded
Document the date/time of inspection and the person performing the test.
Pre-Test Conditions
-
Harness is not installed in assembled gear
Confirm the harness is being tested before installation into the final assembly.
-
Test equipment calibrated and within due date
Verify continuity tester and hi-pot/insulation test equipment calibration status is current.
-
Test setup and safety controls verified
Confirm leads, adapters, guarding, and safe work practices are in place before energizing test equipment.
Continuity Verification
-
Point-to-point continuity matches wiring diagram
Verify each conductor has continuity only to the intended termination points per the approved wiring diagram.
-
No opens, shorts, or miswires detected
Confirm there are no open circuits, unintended shorts, crossed conductors, or reversed terminations.
-
Measured continuity resistance
Record measured resistance for the continuity test.
-
Continuity exceptions documented
List any failed circuits, suspect terminations, or rework actions required.
Hi-Pot / Insulation Testing
-
Hi-pot test performed to approved procedure
Confirm the insulation test was performed using the approved voltage, dwell time, and test method for this harness.
-
Applied test voltage recorded
Record the applied hi-pot or insulation test voltage.
-
Leakage current within acceptable limit
Record measured leakage current and confirm it is within the approved limit for the harness.
-
Insulation breakdown or flashover observed
Confirm no insulation breakdown, arcing, flashover, or test failure occurred during hi-pot testing.
Acceptance and Closeout
-
Harness released for installation
Indicate whether the harness passed inspection and may be released for installation into assembled gear.
-
Deficiencies and corrective actions documented
Record any non-conformances, rework instructions, retest requirements, or disposition notes.
-
Inspector signature
Inspector signature confirming the test record is complete and accurate.