Water Pump and Lift Station Weekly Inspection
Water Pump and Lift Station Weekly Inspection
Weekly inspection template for water pump and lift stations covering wet well conditions, level controls, alarms, standby power, and amperage readings against baseline.
Inspection Details and Site Identification
- Inspection date and time recorded
- Station name and location identified
- Inspector name and qualification recorded
- Inspection performed using current site checklist or SOP
- Any site access restrictions or unsafe conditions noted before entry
Wet Well and Hydraulic Conditions
- Wet well liquid level within normal operating range
- Wet well shows no visible signs of overflow, backflow, or surcharging
- Wet well interior free of unusual debris, ragging, grease buildup, or obstruction
- Influent and discharge piping show no visible leaks, vibration damage, or loose fittings
- Wet well odor, corrosion, or condition concerns documented
Level Controls, Pumps, and Alarm Function
- Float switches, transducers, or level sensors are secure and free of visible damage
- Lead/lag pump control sequence operates as intended
- Pump start and stop controls respond normally during functional check
- High-level alarm activates and is acknowledged at the control panel or SCADA
- Alarm annunciation, beacon, horn, or remote notification functions properly
- Control panel indicators, selector switches, and status lights are legible and operating
Standby Power and Electrical Readings
- Standby power source available and in ready status
- Generator or backup power transfer test completed successfully
- Fuel level, battery condition, and charger status acceptable
- Motor amperage reading recorded for each operating pump
- Amperage is within acceptable baseline range for each pump
Housekeeping, Safety, and Corrective Actions
- Access ways, ladders, and walking surfaces are clear and in safe condition
- Required PPE used for the inspection task
- Any deficiencies or non-conformances identified
- Corrective actions, work order numbers, or escalation notes entered
- Inspector signature completed
Ask AI
Template Studio