UV Coating Cure Verification Log - MEK Double Rub
UV Coating Cure Verification Log - MEK Double Rub
Inspection log for recording MEK double-rub counts, tack checks, and adhesion observations to verify UV or electron-beam coating cure and establish a job-specific baseline pass/fail result.
Inspection Details
- Job / work order identifier recorded
- Inspection date and time recorded
- Inspector name and department recorded
- Coating process identified as UV or EB
- Reference SOP or test procedure available
- Product, substrate, and coating lot numbers recorded
Test Setup and Sample Identification
- Test panel or production sample identified
- Test area cleaned and free of visible contamination
- MEK solvent and applicator prepared for test
- Rub direction and test area defined before starting
- Ambient conditions recorded if required by procedure
MEK Double-Rub Results
- Baseline double-rub count achieved before coating softening or transfer
- Coating surface remained intact during test
- No tackiness observed after solvent rubs
- No visible color transfer, smear, or coating lift observed
Adhesion and Cure Assessment
- Adhesion remained acceptable after MEK rub test
- Cure result meets job specification or baseline requirement
- Any evidence of incomplete cure, softening, or solvent attack
Disposition and Corrective Action
- Product released for next process step
- Non-conformance or corrective action documented when required
- Disposition selected
Ask AI
Template Studio