Spout Insertion and Torque Verification Record
Spout Insertion and Torque Verification Record
Inspection record for verifying spout placement, seal integrity, and cap torque on spouted pouches to confirm leak-free fitments meet specification.
Inspection Details
- Inspection date and time
- Product name / SKU
- Lot or batch number
- Production line or machine ID
- Inspection basis
Spout Placement and Orientation
- Spout present and correct part number
- Spout fully inserted to specified depth
- Spout orientation and alignment correct
- No visible deformation, cracking, or damage at fitment
- Photo of spout placement
Seal Integrity and Leak Verification
- Seal around spout is continuous and intact
- No leaks observed during visual or pressure check
- Seal area free of wrinkles, contamination, or incomplete bonding
- Fitment passes hold or squeeze test per SOP
Cap Torque Verification
- Measured cap torque
- Torque within specification
- Cap threads engage smoothly and fully
Disposition and Sign-Off
- Inspection result
- Non-conformance or corrective action notes
- Inspector signature
Ask AI
Template Studio