Solar Installation Pre-Job Site Walk

Solar Installation Pre-Job Site Walk

Pre-job site walk inspection for solar installations covering roof condition, shading, electrical interconnection, and permit readiness.

Site Access and General Conditions

  • Work area and access path are clear of obstructions
    Walkways, driveways, ladders, and staging areas are free of trip hazards, debris, loose materials, and stored items that would block safe access.
  • Weather conditions are suitable for roof work
    Document current weather and verify there is no active precipitation, lightning, high winds, or other conditions that would make rooftop work unsafe.
  • Roof access method identified and safe to use
    Confirm the planned access method (ladder, interior access, lift, or other) is available, stable, and appropriate for the site.
  • Utility shutoff locations and emergency contacts identified
    Verify the crew knows the location of utility disconnects, emergency shutoffs, and the site contact list before work begins.

Roof Condition and Structural Readiness

  • Roof covering is intact at planned attachment areas
    Check shingles, tiles, membrane, or metal panels at the planned array and attachment points for cracks, missing sections, corrosion, punctures, or active deterioration.
  • Roof penetrations, flashing, and sealant condition acceptable
    Inspect existing vents, skylights, chimneys, and previous penetrations for visible leaks, damaged flashing, failed sealant, or other deficiencies that may affect installation.
  • Roof slope and work surface allow safe installation
    Document whether the roof pitch, surface condition, and footing are suitable for safe PV installation and fall protection planning.
  • Visible signs of structural distress noted
    Look for sagging, deflection, water damage, rot, cracked rafters, compromised decking, or other visible indicators that warrant engineer review or AHJ follow-up.
  • Roof work area measured and documented
    Record the approximate usable roof area and note any obstructions that reduce array placement options.

Shading and Array Layout

  • Shading obstructions identified during site walk
    Document trees, chimneys, vents, dormers, antennas, neighboring structures, and seasonal obstructions that may affect production.
  • Proposed array location has acceptable solar exposure
    Confirm the selected array area has adequate exposure for the project design and note any significant shading concerns that could reduce output.
  • Setback, fire access, and roof layout constraints reviewed
    Verify the layout accounts for required setbacks, ridge/edge clearances, and any fire access or maintenance pathways required by the AHJ.
  • Array layout marked or documented on site
    Confirm the planned module and racking layout has been marked, sketched, or otherwise documented for field use.

Electrical Interconnection and Equipment

  • Main service panel and disconnect locations identified
    Confirm the location of the main service equipment, PV interconnection point, and any required disconnects is known and accessible.
  • Service capacity and interconnection details verified against design
    Check that the existing service rating, breaker space, and planned interconnection method match the approved design and permit documents.
  • Equipment delivery matches approved submittals
    Verify modules, inverter(s), racking, disconnects, and other major components match the approved model numbers and quantities.
  • Grounding and bonding plan reviewed
    Confirm the crew understands the grounding and bonding approach for the system and that required materials are available.
  • Lockout/tagout or energy control needs identified
    Determine whether any energized work, shutdown coordination, or lockout/tagout steps are required before installation or tie-in work begins.

Permits, Documentation, and Sign-Off

  • Approved permit set available on site
    Verify the latest approved permit drawings, revisions, and inspection documents are available to the crew before work begins.
  • Utility interconnection requirements reviewed
    Confirm any utility application, net metering, or interconnection requirements are understood and documented for the project.
  • Open deficiencies documented with corrective actions
    Record any deficiencies, non-conformances, or field changes discovered during the walk and assign next steps before mobilization.
  • Inspector signature
    Inspector confirms the site walk findings and readiness status.
Ask AI Template Studio

Let's customize Solar Installation Pre-Job Site Walk.

Tell me how you'd like to adapt it. For example:

  • Add a question about delivery time.
  • Make it shorter — 5 questions max.
  • Tailor it for the hospitality industry.
  • Translate the labels into Spanish.
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?