Site Erosion Control Inspection
Site Erosion Control Inspection
Inspection template for evaluating erosion and sediment control measures on active sites, including silt fence, wattles, inlet protection, stabilization, and discharge points.
Inspection Details
- Inspection date and time recorded
- Inspection triggered by scheduled weekly check or post-rain event
- Inspector name and company
- Site area or phase inspected
- Weather conditions at time of inspection
Perimeter and Downslope Controls
- Silt fence is installed along required perimeter locations
- Silt fence is upright, anchored, and free of undercutting or bypass flow
- Silt fence is free of tears, collapsed sections, or overtopping sediment buildup
- Wattles or fiber rolls are installed at required contour or slope locations
- Wattles are intact, properly staked, and not displaced by runoff
Inlet and Drainage Protection
- Storm drain inlet protection is installed at required inlets
- Inlet protection is secure, functional, and not causing ponding or bypass
- Sediment accumulation at inlet protection is within acceptable limits
- Discharge points show no visible sediment-laden runoff leaving the site
Stabilization and Bare Soil Areas
- Disturbed soil areas are stabilized with seed, mulch, matting, or other approved cover
- Temporary or permanent stabilization is adequate for exposed slopes and stockpiles
- Bare soil areas show no active rilling, gullying, or slope failure
- Stockpiles are protected and stabilized to prevent sediment transport
Housekeeping, Maintenance, and Documentation
- Accumulated sediment has been removed from controls before reaching failure level
- Damaged or displaced erosion controls have been repaired or replaced
- Construction entrances, haul routes, and adjacent pavement are free of tracked sediment
- Corrective actions assigned with responsible party and due date
- Inspector signature completed