Scissor Lift Pre-Operation

Scissor Lift Pre-Operation

ANSI A92.20 daily pre-op for scissor-type MEWPs (vertical lift). Covers chassis, deck, guardrails, controls, and platform safety.

Inspection Setup

  • Equipment identification recorded
    Record the unit ID, make/model, and location.
  • Inspection date and time recorded
    Document when the pre-operation inspection was completed.
  • Operator/inspector authorized and trained
    Inspector confirms they are authorized to perform the pre-use check and operate the lift if needed.

Chassis and Base

  • Chassis free of visible cracks, deformation, or missing hardware
  • Wheels, tires, and casters in serviceable condition
    Check for cuts, flat spots, loose components, or abnormal wear.
  • Hydraulic system free of visible leaks
    Inspect hoses, fittings, cylinders, and the base area for fluid leakage.
  • Battery or power source secure and undamaged
    Verify battery compartment, cables, connectors, and charging components are secure and free of damage.

Platform, Deck, and Guardrails

  • Platform deck clean, dry, and free of slip/trip hazards
    Check for debris, oil, tools, loose materials, or standing liquid on the deck.
  • Guardrails, mid-rails, and toe boards intact and secure
    Verify all required platform edge protection is present, properly installed, and not damaged.
  • Gate or access chain closes and latches properly
    Confirm the entry point secures fully and does not create an opening during use.
  • Platform extension deck, if equipped, operates and locks correctly
    Inspect extension deck movement, locking mechanism, and condition.

Controls and Safety Devices

  • Emergency stop functions at ground and platform controls
    Test both emergency stop devices for proper operation.
  • All control switches, joysticks, and buttons operate smoothly
    Check for sticking, delayed response, or unintended movement.
  • Up/down, drive, and steer functions respond correctly
    Verify the lift raises, lowers, drives, and steers as expected without abnormal noise or movement.
  • Alarm, horn, and warning indicators function
    Confirm audible and visual warning devices operate properly.

Final Safety Check

  • No unresolved deficiency or non-conformance identified
    If any item failed, the lift must be removed from service and tagged out until repaired and re-inspected.
  • Inspection completed and signed
    Inspector signs to confirm the pre-operation inspection was completed.
Ask AI Template Studio

Let's customize Scissor Lift Pre-Operation.

Tell me how you'd like to adapt it. For example:

  • Add a question about delivery time.
  • Make it shorter — 5 questions max.
  • Tailor it for the hospitality industry.
  • Translate the labels into Spanish.
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?