Piping Hydrostatic Test Record
Piping Hydrostatic Test Record
Inspection template for documenting piping hydrostatic pressure tests, including test pressure, hold time, gauge readings, leak observations, and pass/fail status in line with ASME B31.3 pressure testing expectations.
Inspection Details
- Project / work order number
- System / line identification
- Test date and time
- Inspector / tester name
Test Setup and Preconditions
- Test procedure reviewed and approved
- Test medium confirmed as water or approved hydrostatic medium
- System isolated from non-test equipment and protected components
- Pressure relief / venting arrangement verified
- Ambient temperature at test start
Test Equipment and Gauge Calibration
- Primary pressure gauge identification
- Primary pressure gauge calibration in date
- Secondary / reference gauge identification
- Gauge range suitable for test pressure
- Calibration certificate / tag reference
Pressure Test Results
- Design pressure
- Required test pressure
- Actual test pressure achieved
- Hold time at test pressure
- Initial gauge reading at start of hold
- Final gauge reading at end of hold
Acceptance, Deficiencies, and Sign-Off
- Visible leakage, sweating, or pressure loss observed
- Test result
- Deficiencies / non-conformances noted
- Inspector signature
Ask AI
Template Studio