Management of Change Pre-Startup Verification
Management of Change Pre-Startup Verification
Pre-startup safety review inspection for management of change, covering approvals, training, documentation, and field verification before startup.
Change Scope and Authorization
-
Change description matches the approved MOC package
Confirm the equipment, process, software, or procedural change being reviewed matches the approved management of change scope.
-
Required approvals are complete and current
Verify sign-off from required functions such as operations, maintenance, engineering, EHS, and management is complete before startup.
-
Hazard review or risk assessment completed
Confirm the change has been reviewed for process, mechanical, electrical, fire, and human-factor hazards as applicable.
-
Temporary bypasses, overrides, or deviations are documented and approved
Verify any temporary bypasses, interlock overrides, alarm suppressions, or deviations are formally approved with an expiration or removal plan.
-
Startup authorization is issued
Confirm the responsible authority has authorized startup after completion of the pre-startup review.
Training and Competency
-
Affected operators have been trained on the new or changed process
Confirm operators understand normal operation, startup, shutdown, abnormal conditions, and key hazards associated with the change.
-
Maintenance personnel have been trained on new equipment or controls
Verify maintenance staff received training on inspection, troubleshooting, isolation, and repair requirements for the modified system.
-
Emergency response and abnormal condition procedures reviewed
Confirm affected personnel know the response steps for leaks, alarms, trips, releases, fire, or other credible abnormal events.
-
Training records are available and signed
Verify training documentation is complete, dated, and signed or electronically acknowledged by the required personnel.
-
Competency verification completed for critical tasks
Confirm any required hands-on demonstration, qualification check, or competency assessment has been completed for critical operating tasks.
Documentation and Procedure Readiness
-
Operating procedures updated to reflect the change
Confirm startup, normal operation, shutdown, and emergency procedures are revised and available at point of use.
-
P&IDs, schematics, or as-built drawings match the installed condition
Verify engineering documents reflect the actual field installation, including valves, instruments, interlocks, and isolation points.
-
Safety data sheets and hazard communication documents are available
Confirm current SDSs, chemical labels, and hazard communication information are accessible for any new or changed materials.
-
LOTO, permit, and isolation procedures are updated
Verify lockout-tagout, confined space, hot work, line break, or other permit procedures reflect the modified equipment or process.
-
Inspection and maintenance requirements are documented
Confirm preventive maintenance, inspection intervals, calibration requirements, and spare parts needs are defined for the changed system.
Field Verification and Safeguards
-
Installed equipment matches approved design and scope
Verify the installed equipment, materials, and configuration match the approved change package and field markups.
-
Guards, interlocks, and safety devices are installed and functional
Confirm machine guards, emergency stops, interlocks, relief devices, alarms, and other safeguards are present and operational.
-
Energy isolation points are identified and accessible
Verify electrical, mechanical, hydraulic, pneumatic, thermal, and chemical isolation points are labeled and accessible for safe servicing.
-
Housekeeping and access paths are clear
Confirm access, egress, maintenance clearance, and emergency routes are unobstructed and free of trip or slip hazards.
-
Fire protection and emergency equipment remain accessible
Verify extinguishers, alarms, eyewash stations, showers, and emergency exits are accessible and not blocked by the change.
Startup Readiness and Closeout
-
Open deficiencies are documented with owners and due dates
Record any remaining non-conformances, assign corrective actions, and confirm they do not prevent safe startup.
-
Outstanding punch list items are risk-assessed and approved
Verify any remaining punch list items have been reviewed for startup risk and are formally accepted by the responsible authority.
-
Startup decision recorded
Document whether startup is approved, approved with restrictions, or not approved, along with the reason and approver.
-
Inspector signature captured
Capture the signature of the person completing the pre-startup verification.
-
Review date and time recorded
Record when the pre-startup safety review was completed.