Lot Release to Construction Checklist
Lot Release to Construction Checklist
Inspection checklist for verifying a lot is ready for construction start, including permit status, approved plot plan, utility readiness, site access, and required safety and code compliance items.
Inspection Details and Lot Identification
- Project name, lot number, and address are confirmed
- Inspection date and release decision recorded
- Inspector name and role documented
- Lot boundaries and access points match the approved site plan
Permits, Approvals, and Document Control
- Building permit is issued and active
- Site plan / plot plan is approved and matches current field conditions
- Required agency approvals are complete (AHJ, utility provider, or local jurisdiction)
- Permit conditions and hold points have been reviewed with the field team
Plot Plan, Layout, and Site Control
- Building corners, setbacks, and easements are staked or marked
- Construction limits, no-disturb areas, and protected zones are identified in the field
- Temporary erosion and sediment controls are installed where required
- Site benchmark, grade reference, and layout control points are available and protected
Utilities and Service Readiness
- Water service is available or temporary water source is approved
- Electrical service is available or temporary power plan is approved
- Sanitary sewer or approved temporary sanitation is in place
- Gas, telecom, and other required utility locates are complete
- Utility conflicts or unresolved service gaps are documented and cleared for start
Access, Safety, and Construction Start Readiness
- Site access road or entrance is passable for planned construction vehicles
- Traffic control, barricades, or signage are installed as required
- Work area is free of unaddressed hazards that would prevent mobilization
- Required pre-start safety requirements have been communicated to the crew
Final Release and Corrective Actions
- All deficiencies and non-conformances are documented with corrective actions
- Lot is approved for release to construction
- Inspector signature captured