Lead and Copper Rule Tap Sampling Field Log
Lead and Copper Rule Tap Sampling Field Log
Field inspection log for documenting first-liter and fifth-liter tap samples at lead service line sites, including stagnation time, site conditions, sample identifiers, and chain-of-custody details for Lead and Copper Rule/LCRI compliance monitoring.
Site & Sampling Event Information
-
Sampling event date and start time recorded
Record the date and time the sampling event began.
-
Site ID and service address documented
Unique site identifier and service address for the sampling location.
-
Sampling purpose identified as Lead and Copper Rule / LCRI compliance
Identify the reason for the sampling event.
-
Sampler name and organization recorded
Name of the field sampler and employer/organization.
Site Conditions and Lead Service Line Verification
-
Lead service line site confirmed
Confirm the site is a designated lead service line sampling location.
-
Sampling point is the designated kitchen or first-draw tap
Confirm the sample was collected from the approved tap location.
-
Aerator, screen, or attachment condition documented
Document the condition of the faucet aerator, screen, or other attachment.
-
Site access and interior conditions noted
Record any access limitations or site conditions that may affect sampling.
Stagnation Time and Pre-Sampling Requirements
-
Stagnation start time recorded
Time when water use ceased for the required stagnation period.
-
Stagnation duration meets sampling protocol
Measured stagnation time before sample collection.
-
No water use occurred during stagnation period
Confirm that no water was used at the tap during the stagnation period.
-
Pre-sampling flush or disturbance observed
Confirm the tap was not flushed or disturbed before the first-liter sample was collected.
First-Liter Sample Collection
-
First-liter sample bottle ID recorded
Unique identifier for the first-liter sample container.
-
First-liter sample collected from initial draw
Confirm the first-liter sample was collected from the initial water draw at the tap.
-
First-liter collection time recorded
Time the first-liter sample was collected.
-
First-liter sample volume verified
Measured volume of the first-liter sample.
-
First-liter sample sealed and labeled
Confirm the sample was sealed and labeled immediately after collection.
Fifth-Liter Sample Collection
-
Fifth-liter sample bottle ID recorded
Unique identifier for the fifth-liter sample container.
-
Fifth-liter sample collected after first four liters discarded or routed per protocol
Confirm the fifth-liter sample was collected according to the approved fifth-liter protocol.
-
Fifth-liter collection time recorded
Time the fifth-liter sample was collected.
-
Fifth-liter sample sealed and labeled
Confirm the sample was sealed and labeled immediately after collection.
Chain of Custody, Deviations, and Sign-Off
-
Chain-of-custody form completed and sample transfer documented
Confirm the chain-of-custody record is complete for all collected samples.
-
Any deviations, non-conformances, or field issues documented
Record any protocol deviations, unusual site conditions, or issues affecting sample validity.
-
Inspector signature
Signature of the person completing the field log.
Ask AI
Template Studio