HVAC Test and Balance Certification Review
HVAC Test and Balance Certification Review
Inspection template for reviewing HVAC test and balance certification results, including air and water balancing, damper alignment, and documentation completeness.
Project and Certification Details
- Project name, location, and system identifiers match the certification package
- TAB contractor and certified technician credentials are documented
- Report date, test date range, and revision status are complete
- Referenced design documents, sequences of operation, and setpoint criteria are included
- Equipment schedule, system list, and room/zone references are traceable in the report
Air Balance Verification
- Supply air volumes are reported for each terminal unit or outlet
- Return and exhaust air volumes are reported and balanced to system intent
- Outside air intake is measured and documented against minimum ventilation requirements
- Measured airflow values are within acceptable tolerance of design values
- Airflow measurement methods, instruments, and calibration dates are documented
Water Balance Verification
- Design and measured flow rates are documented for each hydronic circuit
- Pump, coil, and branch circuit differential pressure readings are included where applicable
- Balancing valves and flow control devices are identified and setpoints are recorded
- Measured water flow is within acceptable tolerance of design flow
- Hydronic test instruments and calibration records are documented
Damper and Control Alignment
- Supply, return, exhaust, and outside air dampers are positioned and labeled correctly
- Damper blade alignment and actuator linkage are secure and functional
- Control valves and balancing valves are set to documented positions
- Sequences of operation reflect the final balanced condition
- Observed damper or control non-conformances are listed with location and corrective action
Exceptions and Non-Conformances
- All deficiencies and non-conformances are clearly identified
- Each exception includes location, measured value, design value, and variance
- Corrective actions, responsible party, and target completion date are documented
- Items requiring re-test or follow-up are clearly marked
Documentation and Approval
- Final TAB report includes all required signatures and dates
- Calibration certificates, field notes, and supporting attachments are included
- As-built drawings, O&M references, and commissioning closeout documents are attached or referenced
- Reviewer approval or rejection status is recorded