Foundation Pre-Pour Inspection
Foundation Pre-Pour Inspection
Inspection template for verifying foundation pre-pour readiness, including rebar size and spacing, concrete cover, dowels, and slab penetrations before placement.
Project and Pour Readiness
- Project name, location, and pour area identified
- Pre-pour inspection performed before concrete delivery begins
- Approved drawings, specifications, and latest revision available on site
- Weather and site conditions acceptable for placement
Formwork and Subgrade Readiness
- Formwork line, grade, and dimensions match approved layout
- Forms are secure, braced, and free of visible movement or gaps
- Subgrade/base is compacted, trimmed, and free of standing water or loose material
- Vapor barrier, if specified, is installed intact and lapped/sealed per project requirements
Rebar Size, Placement, and Spacing
- Rebar size matches approved drawings and bar schedule
- Rebar spacing matches approved drawings
- Reinforcement is properly supported on chairs/spacers and not resting on subgrade
- Rebar is tied, secured, and free of displacement before pour
- Splices, laps, and bar continuity appear consistent with approved details
Concrete Cover and Edge Conditions
- Concrete cover meets project requirements at bottom reinforcement
- Concrete cover meets project requirements at side and edge conditions
- Reinforcement is clear of form faces, penetrations, and embedded items
Dowels, Embeds, and Slab Penetrations
- Dowels are installed at correct size, quantity, and spacing
- Dowels are aligned and adequately embedded per approved detail
- Sleeves, blockouts, embeds, and slab penetrations are correctly located and secured
- Openings and penetrations are clearly marked and protected from displacement during pour
Final Pre-Pour Acceptance
- All deficiencies and non-conformances documented with corrective actions
- Inspector approval to proceed with concrete placement
- Inspector signature