First Aid Kit Stocking Audit
First Aid Kit Stocking Audit
Construction first aid kit stocking audit aligned to ANSI Z308.1, covering kit type, required contents, and expiration/date checks.
Kit Identification and Placement
-
Kit type matches site needs and ANSI Z308.1 stocking level
Confirm the first aid kit is appropriate for the construction site and stocked to the expected ANSI Z308.1 level for the crew size and hazard profile.
-
Kit is clearly labeled and identifiable
Kit is marked so workers can quickly locate it in an emergency.
-
Kit is accessible and unobstructed
Kit is stored in a location that can be reached quickly without moving materials or equipment.
-
Inspection date recorded
Record the date of this inspection.
Required ANSI Z308.1 Contents
-
Adhesive bandages present
Verify adhesive bandages are stocked and available for use.
-
Antiseptic cleansing wipes or solution present
Verify antiseptic cleansing supplies are included in the kit.
-
Sterile gauze pads present
Verify sterile gauze pads are included and not damaged.
-
Roller bandage present
Verify roller bandage is stocked and ready for use.
-
Medical exam gloves present
Verify disposable medical gloves are included and packaging is intact.
-
Trauma dressing or compress present
Verify a trauma dressing or compress is included for larger bleeding incidents.
-
Burn treatment supplies present, if required by site hazard assessment
Verify burn treatment supplies are included when the hazard assessment indicates a need.
Expiration and Condition Checks
-
All dated items are within expiration date
Check antiseptics, burn supplies, medications if present, and any other dated items for expiration.
-
Packaging is sealed and undamaged
Verify individual item packaging is intact, dry, and free from contamination.
-
Supplies are clean and dry
Confirm contents are not exposed to moisture, dirt, or other contamination.
-
Damaged, missing, or expired items documented
Record any deficiencies found during the inspection.
Readiness and Corrective Action
-
Kit is fully stocked and ready for immediate use
Verify no critical deficiencies remain after inspection.
-
Replenishment or corrective action completed or assigned
Document the action taken for any missing, expired, or damaged items.
-
Inspector signature
Signature of the person completing the inspection.
Ask AI
Template Studio