Inspection Details and Readiness
-
Project area, system type, and inspection date recorded
Document the building area, sprinkler system type, and date of final acceptance inspection.
- Approved plans, submittals, and test procedures available on site
- AHJ, owner representative, and contractor present or notified as required
- System isolated, tagged, and ready for acceptance testing
- Test gauges, calibrated instruments, and measuring devices available
Hydrostatic Pressure Test
- Hydrostatic test pressure recorded
- Hydrostatic test duration recorded
- No leakage, pressure loss, or visible deformation observed during test
- Test pressure maintained at or above required acceptance level
Flushing and Water Quality
- Main and branch lines flushed before acceptance
- Discharge observed clear of debris, scale, and construction sediment
- Flush duration and discharge location documented
- Strainers, caps, plugs, and temporary devices removed or accounted for
System Component Verification
- Sprinkler heads installed per approved spacing, orientation, and type
- Control valves accessible, identified, and in normal open position
- Alarm devices, supervisory switches, and waterflow signals function correctly
- Drain, inspector's test, and auxiliary valves operate as intended
Final Acceptance and Documentation
- All deficiencies, non-conformances, and corrective actions documented
- As-built drawings, test records, and 200 psi documentation attached
- Final acceptance approved by inspector and responsible party