Inspection Details
- Vessel / facility name recorded
- Date and time of pre-operation test recorded
- Inspector and competent person identified
- System status confirmed as pre-operation / out of service for testing
ESD-1 Initiator Functional Tests
- High-high level initiator trips the ESD-1 circuit
- High pressure initiator trips the ESD-1 circuit
- Initiator setpoint recorded for each tested device
- Trip response observed at the control panel / alarm annunciator
- Reset and rearm function verified after test
Shutdown Valve Closure Timing
- ESD shutdown valve closure time measured
- Measured closure time within approved acceptance criteria
- Valve position indication matches actual valve position
- No abnormal leakage, sticking, or delayed actuation observed
Surge Pressure Alleviation and Process Protection
- Surge pressure alleviation device or logic activated as designed
- Maximum observed pressure during shutdown recorded
- Pressure transient remained within approved operating limits
- No unintended process upsets, line hammer, or secondary trips observed
Deficiencies, Corrective Actions, and Signoff
- Deficiencies or non-conformances documented
- Corrective action required for any failed critical item
- Inspector signature