Electric Meter Installation and Removal Verification
Electric Meter Installation and Removal Verification
Field inspection template to verify correct electric meter installation, removal, sealing, reading, and tamper status documentation, with account and meter identifiers recorded.
Inspection Details and Work Authorization
- Work order, service address, and account number are documented
- Meter work type is identified as installation, removal, or replacement
- Authorization to perform meter work is confirmed
- Required PPE for the task is available and worn
- Lockout-tagout or service isolation requirements are verified before work
Meter Identification and Condition
- Meter number matches the work order and site record
- Meter socket and enclosure are intact with no visible damage
- Meter jaws, terminals, and connections show no visible overheating, corrosion, or looseness
- Meter orientation and seating are correct for the installed position
Installation, Removal, and Sealing Verification
- Meter is fully seated and secured in the socket or removed completely from service
- Seal number is recorded and matches the installed seal or removed seal log
- Seal is intact and properly applied, or removal seal condition is documented
- Tamper indicators or evidence of unauthorized access are documented
Reading and Electrical Verification
- Initial meter reading is recorded
- Final meter reading is recorded, if applicable
- Polarity, voltage, and service configuration are verified against site requirements
- Re-energization or service restoration is safe and authorized
Documentation, Photos, and Sign-Off
- Photo evidence of meter, seal, and final condition is attached
- Exceptions, deficiencies, or non-conformances are documented
- Corrective actions and follow-up owner are assigned for any deficiency
- Inspector sign-off is completed