Dish Pit Setup / Closing
Dish Pit Setup / Closing
Pre-open setup + close-of-night closing for dish pit. Includes dish machine final-rinse temperature verification (≥180°F or chemical sanitizer dose).
Inspection Details
- Inspection type selected
- Inspection date and time recorded
- Dish pit location identified
- Inspector or shift lead name recorded
-
Reference SOP available to inspector
Verify the current dish pit opening/closing SOP or site procedure is available for reference.
Pre-Open Setup
- Dish area floors, sinks, and work surfaces are clean and free of debris
- Three-compartment sink or dish station is assembled and ready for use
-
Wash, rinse, and sanitize solutions are set up correctly
Verify each sink or station is filled and labeled according to site procedure.
- Detergent, sanitizer, and test strips are available at the dish pit
- Clean racks, bus tubs, and utensil holders are available
-
Handwashing supplies are stocked and accessible
Soap, paper towels, and a clear handwashing sink must be available within the dish area or immediate work zone.
Dish Machine Readiness and Sanitation
- Dish machine exterior and interior are clean
- Spray arms, curtains, screens, and strainers are installed and unobstructed
-
Final-rinse temperature verified at or above 180°F
Record the measured final-rinse temperature for high-temperature sanitizing machines. FDA Food Code 2022 requires a final rinse of at least 180°F at the manifold for hot-water sanitization.
-
Chemical sanitizer dose verified for low-temperature machine
Record sanitizer concentration when the machine uses chemical sanitization instead of high-temperature final rinse.
- Machine cycle runs without leaks, alarms, or abnormal noise
During Service Controls
- Dirty and clean dish flow is separated
- Food debris is removed from wares before washing
- Chemical containers are labeled and stored away from food-contact items
-
PPE is available and used as required
Verify gloves, apron, and eye protection are used when handling chemicals or hot wares per site procedure.
Closing and Shutdown
- All wares are washed, rinsed, sanitized, and air-dried
- Dish machine is drained, cleaned, and left in accordance with manufacturer instructions
- Screens, strainers, and scrap trays are emptied and cleaned
- Detergent and sanitizer are secured and stored properly
- Floors are swept and mopped, and slip hazards are removed
- Dish pit area is left organized and ready for the next shift
Inspector Sign-Off
- Corrective actions documented for any deficiencies
- Inspector signature