Decking Steel Edge Protection Audit
Decking Steel Edge Protection Audit
Inspection template for auditing steel decking edge protection, including perimeter cables, openings, and controlled decking zone access.
Audit Details and Work Area
- Inspection date and time recorded
- Project, building level, and deck area identified
- Competent person or inspector identified
- Weather and site conditions noted
- Work activity underway in the controlled decking zone documented
Perimeter Edge Protection
- Perimeter cable or equivalent edge protection installed where required
- Perimeter cable is continuous, properly anchored, and free of visible damage
- Cable height and placement are consistent with site fall protection plan
- Intermediate members, turnbuckles, and connectors are secure
- No missing sections, slack conditions, or unauthorized removals observed
Openings, Holes, and Leading Edges
- All floor openings and deck penetrations are covered, guarded, or otherwise protected
- Opening covers are secured against displacement and labeled as required
- Leading edges are clearly identified and controlled to prevent exposure
- Materials, tools, and debris are not creating a trip, slip, or fall hazard near openings
- Guardrails, warning lines, or equivalent protection are intact around openings where required
Controlled Decking Zone Access
- Controlled decking zone is clearly defined and limited to authorized personnel
- Access points to the controlled decking zone are controlled or monitored
- Only trained workers with required PPE are present in the controlled decking zone
- Warning signs, barricades, or demarcation are visible and legible
PPE, Housekeeping, and Final Verification
- Required fall protection PPE is in use and properly fitted
- Housekeeping is adequate and walking surfaces are free of excess debris
- Any deficiency or non-conformance has been documented with corrective action assigned
- Inspector final risk rating